Nektar Therapeutics

November 9, 2017

San Francisco, CA Engineer: Decker Electric Square Footage: 100,000 Project Value: $2,950,000 The Nektar project consisted of an 100,000 sq ft bio-pharmaceutical lab project with 55,000 sq ft of labs and 45,000 sq ft of office space. We completed design/build, electrical and safety as well as voice/data features. We...

Illumina

November 9, 2017

San Francisco, CA Engineer: EXP Engineering Square Footage: 97,000 Project Value: $4,900,000 The Illumina project consisted of a 95,000 sq ft bio-pharmaceutical research and development facility with 65,000 sq ft of research and development labs and 30,000 sq ft of commercial office space. Decker completed a major renovation including...

Genesis Tower

November 9, 2017

South San Francisco, CA Engineer: Decker Electric Square Footage: 165,000 Project Value: $11,500,000 Phase 3 Real Estate engaged Decker Electric as their design/build electrical partner to convert an existing office tower to accommodate lab users on 6 floors with electrical and fire safety features. The scope included a new...

Genentech Bldg 6

November 9, 2017

South San Francisco, CA Engineer: Decker Electric Square Footage: 125,000 Project Value: $6,321,000 The Genentech Building 6 scope of work included design/build, new power distribution; area and task lighting; fire alarm and smoke control system; HVAC equipment wiring; and a complete security system. For this project, Decker performed all...

Calico Labs

November 9, 2017

South San Francisco, CA   Engineer: Decker Electric Square Footage: 93,000 Project Value: $8,500,000 Calico Labs looked to Decker to perform design/build as well as life safety and core & shell electrical work for a large dining and serving area, tech talk space, conference rooms, private offices, open offices,...

Genentech Bldg 7, FRC-I, FRC-II

November 9, 2017

South San Francisco, CA Engineer: Gayner Engineers Square Footage: 1,046,000 Project Value: $21,790,000 This 3-year project for Genentech demanded that Decker complete the design-assist electrical infrastructure upgrades to critical buildings across the campus. The intricate project scope included providing temporary power to entire buildings via portable 2-megawatt generators, transfer...